What floor stripping and waxing cost is made of
Strip and wax pricing is almost all labor and time: moving furniture, laying stripper, scrubbing, picking up slurry, rinsing, then several coats of finish with drying time between each. Chemicals, pads and machines are the smaller share. No government survey publishes floor stripping and waxing prices or per-square-foot rates, so this page shows how the labor adds up and which rules add steps.
| Part of the price | What moves it | Public data |
|---|---|---|
| Labor hours | Square footage, furniture, layers of old finish, number of new coats, edges and corners | None published; ask each bidder for hours or its production rate |
| Wage rate | Local labor market, night and weekend work | BLS: $17.71 an hour national median for janitors, May 2025 |
| Benefits and payroll taxes | Leave, insurance, Social Security, Medicare, workers' compensation | BLS: $5.47 an hour, private-industry service workers, June 2026 |
| Chemicals and pads | Stripper, neutralizer, finish coats, pads | None published; ask which products and how many coats |
| Safety equipment | PPE, eyewash, wet-floor signs and barriers | Required by the OSHA rules below |
| Overhead and profit | Supervision, insurance, travel, margin | None published |
The steps themselves are on the floor stripping and waxing service page. Here the question is how long each one takes.
Floor stripping and waxing pricing: strip, recoat or burnish
The biggest price lever is which service the floor actually needs. A full strip takes the finish down to bare tile; a scrub and recoat removes only the worn top layer; a burnish polishes what is there. Each step down takes far fewer labor hours per square foot.
| Service (example) | Production rate (assumed) | Labor hours for 5,000 sq ft | Wages at median | Wages plus benefits |
|---|---|---|---|---|
| Strip and refinish | 200 sq ft per labor hour | 25 | $442.75 | $579.50 |
| Scrub and recoat | 500 sq ft per labor hour | 10 | $177.10 | $231.80 |
| Burnish | 2,500 sq ft per labor hour | 2 | $35.42 | $46.36 |
Production rates are example assumptions for illustration, not sourced rates. Labor hours = square feet / rate. Wages plus benefits = hours x $23.18.
Strip and wax floors cost: work out your own labor
Ask each bidder for its production rate (square feet per labor hour) or its total crew hours, then read the labor off this table. Area and rate are your inputs; the wage is the BLS national median.
| Floor area (your input) | At 150 sq ft per labor hour | At 250 sq ft per labor hour | At 400 sq ft per labor hour |
|---|---|---|---|
| 2,000 sq ft | 13.3 hrs, $236.13 | 8.0 hrs, $141.68 | 5.0 hrs, $88.55 |
| 5,000 sq ft | 33.3 hrs, $590.33 | 20.0 hrs, $354.20 | 12.5 hrs, $221.38 |
| 10,000 sq ft | 66.7 hrs, $1,180.67 | 40.0 hrs, $708.40 | 25.0 hrs, $442.75 |
Each cell: labor hours = area / rate, and wages = hours x $17.71. Wages only: add benefits, chemicals, equipment, overhead and profit for a full price.
Floor stripping and waxing cost per square foot
Many companies quote strip and wax per square foot. To turn a labor estimate into that form, divide by the area: in the example above, strip and refinish labor with benefits is $579.50 for 5,000 sq ft, or about 12 cents a square foot in labor alone. That is not a price: chemicals, equipment, travel, overhead and profit are added on top, and the assumed production rate drives it. When two per-square-foot quotes differ a lot, ask each company how many coats and crew hours it priced.
OSHA rules that add time and equipment
| Rule | What it says | Effect on cost |
|---|---|---|
| 29 CFR 1910.1200 | Safety data sheets readily accessible during each work shift; training at initial assignment and when a new chemical hazard is introduced | Each hazardous stripper or finish has an SDS on site, with trained staff |
| 29 CFR 1910.132(d)(1) | "The employer shall assess the workplace to determine if hazards are present, or are likely to be present, which necessitate the use of personal protective equipment (PPE)." | Gloves, eye protection and footwear chosen from the hazard assessment and the product SDS |
| 29 CFR 1910.151(c) | "Where the eyes or body of any person may be exposed to injurious corrosive materials, suitable facilities for quick drenching or flushing of the eyes and body shall be provided within the work area for immediate emergency use." | If the stripper's SDS shows it is corrosive, an eyewash or drench must be within the work area |
| 29 CFR 1910.22(a) | Floors kept clean and, to the extent feasible, dry, and walking surfaces free of hazards such as spills | Closing areas off and posting signs until each coat is dry, which sets how much floor a crew can do per shift |
Check the stripper's safety data sheet for its hazard class before the job, so the crew brings the right protective equipment and eyewash.
What raises or lowers the cost
Pushes it up
- Many layers of old finish or heavy edge buildup
- Lots of furniture, shelving or equipment to move
- More coats of finish, each with drying time
- Small rooms, corridors and edges instead of open floor
- Overnight or weekend work to keep the space open
- Floors that have gone years without maintenance
Brings it down
- A scrub and recoat where the finish is still intact
- Daily dust mopping and entrance mats between services
- Burnishing on a schedule in busy areas
- Furniture moved by your staff before the crew arrives
- Large open areas done in one shift
- Several sites or floors booked together
A floor kept on a regular scrub-and-recoat and burnish schedule needs a full strip less often, which is usually the cheapest way to own a VCT floor. For other hard floors, see commercial floor cleaning; for one-time work after a build-out, see post construction cleaning cost.
How to get strip and wax quotes you can compare
- Measure the area and list rooms, floor type and how much furniture must move.
- Ask for the service: full strip and refinish, or scrub and recoat, and why.
- Name the coats: how many coats of finish, and which product.
- Ask for crew hours or the production rate, and check it against the table above.
- Set the schedule: nights or weekends, and when the floor can take traffic again.
- Check insurance and the SDS file before work starts; our hiring guide covers insurance, and the commercial cleaning cost guide covers overhead and profit.
Questions to ask bidders
- How many crew hours did you price, and how many coats?
- Does our floor need a full strip, or will a scrub and recoat do?
- Is moving furniture included?
- Which stripper and finish will you use, and can we see the safety data sheets?
- What maintenance schedule will delay the next strip?
Red flags
- A per-square-foot price with no coat count.
- Recommends a full strip for a floor with intact finish.
- No safety data sheets or eye protection for the stripper.
- No plan to close off wet areas.
Find companies in your city
We list the most-reviewed janitorial and commercial cleaning companies in 123 cities, with Google ratings, phone numbers and local wage data. Pick your city.
Get free cleaning quotes
Tell us about your facility and we will pass your request to commercial cleaning companies that serve your area. You can also contact any company listed on this page directly.
Quote requests go to partner cleaning companies, which may not be the companies listed on this page. Submitting is free and does not obligate you to hire anyone.
Frequently asked questions
How much does floor stripping and waxing cost?
No government survey publishes strip and wax prices. Cost is mostly labor hours times wages, plus chemicals, equipment, overhead and profit. At the national median janitor wage of $17.71 an hour (BLS, May 2025), every 10 crew hours is $177.10 in wages before benefits.
How much should I charge for stripping and waxing floors?
Start from your labor: square feet divided by your production rate gives crew hours, and crew hours times your wage plus benefits gives labor cost. BLS puts the median janitor wage at $17.71 an hour and service-worker benefits at $5.47. Add chemicals, equipment, insurance, overhead and profit.
How often should a floor be stripped and waxed?
No rule sets it; traffic and maintenance decide. Daily dust mopping, mats, burnishing and periodic scrub and recoat stretch the time between full strips, which are the most labor-intensive service.
Do you mop after stripping floors?
Typically, after the stripper is scrubbed in, the slurry is picked up with a wet vacuum and the floor is rinsed with clean water, and a neutralizer if the product calls for one, so no residue stops the new finish bonding. Follow the stripper label.
Why is scrub and recoat cheaper than stripping?
It removes only the worn top layer of finish and adds fresh coats, so it skips the stripper dwell, heavy scrubbing, slurry pickup and rebuilding every coat from bare tile.
Sources
- Bureau of Labor Statistics: OEWS, ECEC
- OSHA: 29 CFR 1910.1200, 29 CFR 1910.132(d)(1), 29 CFR 1910.151(c), 29 CFR 1910.22(a)